What to check first

Look for loose sheets, damp spots, cracks, dust, and high edges. Check the floor maker’s rules for the base before you buy patch mix or glue.

Why check the base?

A loose sheet can move under a plank. Dust can stop glue from holding. A dip can leave part of the floor with no support.

Find out what the base is

Look at an exposed edge or a floor vent. Is the base wood, concrete, or an old floor the new product can go over? Check the fitting guide.

Check a wood base

Look for loose fasteners, soft spots, gaps, and swollen edges. Get help with sag or rot. A new top layer will not fix weak framing.

Check a slab

Look for cracks, damp patches, old glue, and loose concrete. Mark each spot on a sketch. Ask the installer to check cracks that move.

Clean the surface

Use the prep steps for the new floor and glue. Remove loose dust and debris. Check before using a cleaner that might leave a film.

Old tile or glue may contain asbestos

Do not sand, scrape, grind, or tear up old tile or glue if it may contain asbestos. Leave it in place and have a qualified person check it.

Flat and level mean different things

Flat means the surface has no dips or humps beyond the allowed limit. Level means it does not slope. Check which one the maker calls for.

Find high and low spots

Lay a straightedge across the floor in several directions. Mark gaps below it and points where it rocks. Check the maker’s limit for that span.

What to do with a high spot

First find out what caused it. A raised fastener, a swollen seam, and a slab ridge need different fixes. Follow the prep rules for your base.

What to do with a low spot

Measure its depth and area. Choose a patch or floor mix rated for the base and depth. Check whether you need primer first.

When a slab has cracks

See if the sides have shifted or if the crack changes over time. Have a pro check movement before covering it. Use the crack treatment the new floor calls for.

Check for moisture

A slab can look dry and still give off vapor. Use the test the floor and glue makers require. Keep the readings and the date.

Before the first plank or tile

Check that repairs have set. The base should be clean, sound, and within the flatness and moisture limits for the new floor.

Price the prep work

Count only the sheets, rolls, and bags the job needs. Use the patch area and depth for mix. Use the full floor area for a layer that covers the whole room.

Common questions

Does a subfloor need to be perfectly level?

Check the flatness limit for the floor. A floor can be flat even if it has a slight slope.

How do I know if my subfloor is flat enough?

Place a straightedge of the stated length on the base. Measure the gaps and compare them with the floor guide.

Can underlayment fix an uneven subfloor?

Fix the high and low spots first. A soft pad can hide a gap while the planks still move.

Should I replace damaged plywood before installing flooring?

Have weak or damaged sections checked and fixed. Find and stop the source of the damage.

Can I install flooring over old glue?

Check what the floor maker allows. Stop before you disturb old glue if it may contain asbestos.

Do I need to test concrete for moisture?

Use the test and limits the floor maker lists for the slab.

Can I use self-leveling compound over plywood?

Only use a mix listed for plywood. Check for primer, mesh, and depth rules.

Can I grind down high spots on concrete?

Have the slab and old coatings checked first. Grinding can release harmful dust and needs proper controls.

Industry Standards & Authoritative References

These sources cover floor prep, slab tests, and how to handle old floors.

  • APA – The Engineered Wood Association: Subfloor Prep to Receive Finish Flooring & Engineered Wood Construction Guide (Form E30). Guidelines on structural panel span ratings, moisture exposure, edge ridging, and fastener recommendations.
  • U.S. Environmental Protection Agency (EPA): Asbestos in the Home guidelines. Mandatory safety procedures regarding non-disturbance and professional testing of suspected asbestos-containing resilient flooring and cutback glues.
  • Occupational Safety and Health Administration (OSHA): 29 CFR 1926.1101 (Asbestos Standard) & 29 CFR 1926.1153 (Respirable Crystalline Silica Standard for Construction).
  • Tile Council of North America (TCNA): Handbook for Ceramic, Glass, and Stone Tile Installation. Base deflection criteria ($L/360$ for ceramic, $L/720$ for stone) and surface prep standards.
  • National Wood Flooring Association (NWFA): Wood Flooring Installation Guidelines. Subfloor flatness, moisture content equilibrium, and fastening specs for wood flooring installations.
  • ASTM International: ASTM F2170 (In-Situ Relative Humidity in Concrete Slabs) & ASTM F1869 (Moisture Vapor Emission Rate Using Anhydrous Calcium Chloride).
  • MAPEI & ARDEX Product guide: Technical Data Sheets for self-leveling underlayments (e.g., Novoplan, Ultraplan, K 15) establishing product-specific primer, water-ratio, and base prep rules.